I. Why Are Coal Mines in Shenmu Rushing to Install Emergency Power Supplies?

What exactly is Shenmu?

It ranks among China’s most vital coal‑producing regions. The Jurassic coalfield boasts proven reserves of over 50 billion tons. Featuring superior‑quality coal at shallow burial depths, it is one of the country’s rare bases for high‑grade steam coal and chemical‑grade coal.

Coal mines here are large‑scale with high production capacity and extensive underground working faces. Precisely for this reason, power‑supply safety poses an especially prominent challenge.

In accordance with the Coal Mine Safety Regulations, a mine must be equipped with two power supply circuits. Should one circuit fail, the other shall be capable of bearing the full load. Theoretically known as “dual‑circuit power supply”, this is standard configuration for coal mines.

Nevertheless, reality is far more complicated than theory.

In September 2024, a power‑supply failure occurred at Heshun Tianchi Energy in Shanxi Province. Both circuits lost power simultaneously, shutting down the main ventilation fan for 1 hour and 38 minutes. Thirty‑six instances of gas over‑limit were recorded at 26 underground locations. At one working face, the maximum gas concentration hit 12.19%.

What does 12.19% mean? The lower explosive limit for gas is 5%. Concentrations above 5% fall within the explosion range. At 12%, the reading had far crossed the safety red line. It was purely by chance that there were no fatalities in that incident.

Against this backdrop, regulatory policies have been significantly tightened.

In 2025, Shanxi took the lead by issuing an official document requiring all operational underground coal mines across the province to install emergency power supplies. High‑gas mines must complete the installation by the end of June 2026, while all remaining coal mines shall finish before the end of December 2026. This is not a recommendation, but a mandatory requirement.

Shaanxi is following suit. Coal mines in Shenmu, Fugu and surrounding areas have successively launched retrofitting projects for emergency standby power supplies. The tender notice for Longde Coal Mine specifies a delivery period of merely 60 days for one high‑voltage diesel generator set from contract signing. The schedule is tight and the task arduous, with no room for negotiation.

For Shenmu’s coal mines, the question is no longer whether to deploy emergency power supplies, but when the installation will be completed.

II. Why Two 1200 kW Units?

Is a single 1200 kW set insufficient? Why deploy two units?

The answer is straightforward: this is designed for redundancy, not simply to make up numbers.

Emergency power supplies at coal mines must sustain three critical loads: main ventilation fans, underground drainage pumps, and vertical‑shaft personnel hoisting equipment. None of the three can afford an outage.

Hence, the two 1200 kW generator sets serve as mutual backups. One operates while the other stays on hot‑standby. In the event of an anomaly on either unit, the second one can automatically take over within several seconds. This delivers genuine double protection.

During preliminary communications, the technical team from Mampson Power worked alongside the mine‑side team to conduct a comprehensive recalculation of all first‑class safety‑critical loads across the whole mine.

The final specification: two 1200 kW units, one primary and one standby, operating independently with mutual redundancy. This configuration was not decided arbitrarily; it is the outcome of rigorous engineering calculations.

III. Why Are High‑Voltage Units Indispensable for Coal Mines?

Both units adopt the high‑voltage output solution.

The distribution room of a coal mine is at least several hundred meters away from the wellhead. If 380 V low‑voltage power transmission is adopted, the current will be high, resulting in heavy line losses. High‑voltage power tells a different story. With higher voltage comes lower current. For the same power capacity, much thinner‑gauge cables can be deployed, and losses over long‑distance transmission become nearly negligible.

More importantly, high‑voltage generator sets deliver faster response. Once mains power fails, the units must complete self‑starting, voltage build‑up, closing and load pick‑up within an extremely short window.

On the day of commissioning, engineers from Mampson Power simulated an abrupt mains power outage. Following pre‑programmed logic, both units responded automatically. From the trigger of the power‑loss signal to stable loaded operation, the whole sequence ran smoothly without any stalling.

IV. Three Questions Asked by Liu on Commissioning Day

Liu has spent his entire career working on coal‑mine electromechanical systems. For the commissioning of these two 1200 kW units, he remained on‑site from start to finish.

His first question: “If both units run at full load simultaneously, how long will the fuel tanks last?”

His second question: “If one unit fails to start, how quickly can the other one take over?”

His third question: “After your team leaves, can our own electricians operate the equipment?”

The engineer opened a thick operation manual and turned to the key pages: “Procedures and acceptance criteria are documented for no‑load trial runs, load testing, switching drills and daily patrol inspections. After hand‑over, we will conduct on‑site training.”

Liu smiled this time: “This is really helpful. Good equipment still needs people who know how to operate it properly.”

V. Two Generator Sets: A Reassuring Backbone for the Coal Mine

What does the arrival of the two 1200 kW generating units mean for this coal mine? It means that after a dual‑circuit mains power outage, the main ventilation fans can definitely be started within the specified time. It means underground drainage pumps will not stop working due to power loss. It means the hoisting system is always ready to lift personnel safely out of the mine.

For Mampson Power, participating in this project and delivering emergency power assurance for this Shenmu‑based coal mine represents both our responsibility and our privilege.